✓ You only pay if you get compensation✓ Up to €600 per passenger✓ EC Regulation 261/2004

Lost boarding pass: can you still make a flight delay claim?

Lost boarding pass? You can still make a flight delay claim with your booking email, the app, a bank statement or photos. Checklist of what you need.

Yes: you can still make a flight delay claim after losing your boarding pass, and the same goes for cancelled and overbooked flights. Regulation (EC) 261/2004 requires a confirmed booking and that you turned up for boarding on time, not that you keep a piece of paper: your confirmation email, the boarding pass in the app, a bank statement and a few photos are almost always enough. Here is a checklist to save, rebuild your evidence and prepare the claim.

Free 2-minute check · Nothing to pay upfront · You only pay 25% + VAT if you get compensated

Lost boarding pass: can I still claim?

A boarding pass is handy because it puts your name, flight, date and seat on one page. But it is not the only proof. To claim €250, €400 or €600 in compensation you need to be able to show two things:

  • that you had a ticket for that flight, with a confirmed booking;
  • that you were there: you checked in and presented yourself for boarding, or you were on board the delayed flight.

The airline also records who boards: the scan of your boarding pass at the gate stays in its systems. That is why, in most cases, the booking reference and passenger names are enough to identify the trip. The evidence you keep matters mainly if the airline disputes something.

Alternatives to a boarding pass

Evidence What it proves Where to find it
Booking confirmation email Ticket, flight, date, names Inbox: search for the airline or the booking reference
Boarding pass in the app or phone wallet Check-in done, seat assigned Airline app, wallet, online check-in email
Bank statement or payment receipt Purchase of the ticket Online banking, PayPal, travel agent
Texts, emails and alerts about the delay That it was your flight and what happened Phone, inbox
Photos of the board, the gate or on board Presence at the airport, times Phone gallery (date and time are saved)
Airport receipts, bag tag, taxi receipt on arrival Presence and times Wallet, payment apps
Delay letter from the airline Flight, delay, sometimes the reason Requested from the airline after the flight

The delay letter is often the easiest proof to get: see how in our guide on getting a delayed flight letter for work.

Has this happened to you? Check your flightFind out for free in 2 minutes whether you are owed up to €600 per passenger.
Check your flight

The details your claim really needs

More than paperwork, you need the right details. Before writing to the airline, make sure you have:

  • booking reference (usually 6 letters and numbers);
  • flight number and date, including any connections on the same booking;
  • airports of departure and final destination;
  • names of all passengers exactly as on the ticket, children included;
  • scheduled and actual times, especially the arrival time;
  • what happened and the reason the airline gave;
  • receipts for expenses you paid while waiting, if you want them back.

If you are not sure where to find the booking reference, flight number or operating airline, see our guide on how to read a flight ticket and boarding pass: "operated by" tells you which airline to claim from.

Checklist: rebuild your evidence in 10 minutes

  1. Search your inbox for the airline's name, "booking", "reservation" or "check-in".
  2. Open the airline app: the trip and boarding pass often stay visible under your bookings.
  3. Check your phone wallet and the photos you took at the airport that day.
  4. Download your bank statement showing the ticket payment.
  5. Save texts and alerts about the delay or cancellation.
  6. If you booked through a travel agent, ask them for the confirmation with booking reference and ticket number.
  7. Ask the airline to confirm the flight or send a delay letter, quoting your name and booking reference.
  8. Keep everything in one folder, screenshots included: you will need it for the claim.

You do not need everything: two or three consistent pieces of evidence are usually enough.

Do not wait too long: deadlines and amounts

The longer you wait, the harder it is to find emails and alerts, so rebuild your evidence soon after the trip. Deadlines depend on the country and are explained in our guide on the time limit for a flight delay claim. The amount does not depend on the boarding pass but on distance: €250 up to 1,500 km (Dublin–London), €400 from 1,500 to 3,500 km (Dublin–Tenerife), €600 over 3,500 km (Dublin–New York with a European airline). For your flight, see how flight compensation is calculated.

We handle it, even without a boarding pass

With DelayFlight24 you can check for free in 2 minutes whether you are owed compensation: all you need is your booking reference and flight details on our delayed flight compensation page. If a document is missing, we tell you what to look for, and we handle the claim, the follow-ups and, if needed, court action. You pay nothing upfront and only pay 25% + VAT if you get compensated.

Frequently asked questions about a lost boarding pass

I threw away my boarding pass: have I lost my right to compensation?

No. The right depends on the flight, not on the paper. Your booking confirmation, the app, a bank statement or photos can show you were on board.

Can the airline reject my claim because I have no boarding pass?

It can ask you to prove you were on the flight. If you reply with other consistent evidence, a rejection based only on the missing boarding pass is hard to sustain.

I booked for the whole family: do I need everyone's boarding pass?

No. The booking just needs to show all the passengers' names; each passenger is entitled to compensation, children included.

Can I download my boarding pass again after the flight?

It depends on the airline: sometimes it stays visible in the app or the check-in email. If not, ask for a delay letter or a flight confirmation.

My flight was cancelled and I never had a boarding pass: can I claim?

Yes. For a cancellation a confirmed booking is enough: no boarding pass is needed.

Find out more

Article updated on 23/11/2026 by the DelayFlight24 editorial team.

Was your flight delayed or cancelled?

Find out in 2 minutes how much you are owed. Nothing upfront: you only pay if you get compensation.

  • Check in 2 minutes
  • Nothing upfront
  • Up to €600 per passenger
Check your flight